奥鹏作业答案-谋学网-专业的奥鹏在线作业答案辅导网【官网】

 找回密码
 会员注册

微信登录,扫一扫

手机号码,快捷登录

VIP会员,3年作业免费下 !奥鹏作业,奥鹏毕业论文检测新手作业下载教程,充值问题没有找到答案,请在此处留言!
2022年5月最新全国统考资料投诉建议,加盟合作!点击这里给我发消息 点击这里给我发消息
奥鹏课程积分软件(2021年最新)
查看: 705|回复: 0

2020年春【中石油】油气储运工程专业英语第三阶段在线作业(100分)

[复制链接]
发表于 2020-2-12 21:13:23 | 显示全部楼层 |阅读模式
谋学网
【石油大学】油气储运工程专业英语-第三阶段在线作业
试卷总分:100    得分:100
第1,1.(2.5分)Iftherefineryissuppliedbytanker,daysofstorageisrecommended.
A、30-32
B、32-35
C、6
D、16-18
正确资料:


第2题,2.(2.5分)Naturalgasdemandishighlydependenton.
A、weather
B、regulation
C、production
D、compressor
正确资料:


第3题,3.(2.5分)BecauseLNGmustbestoredatverylowtemperaturestomaintainitinaliquidstate,isoneofthemostimportantelementsofLNGstoragedesign?.
A、temperature
B、pressure
C、insulation
D、shape
正确资料:


第4题,4.(2.5分)Forfixed-rooftank,whichoneisright?
A、For cone-roof tanks, they don't have cylindrical shells.
B、For cone-roof tanks, the top is made in the form of a shallow cone.
C、Umbrella-roof tanks are usually constructed to diameters larger than 60ft.
D、For umbrella-roof tanks, there are column supports that must be run to the bottom of the tank.
正确资料:


第5题,5.(2.5分)Forfloating-rooftanks,theyhaveacoverthatfloatsonthesurfaceofthe.
A、liquid
B、pipeline
C、gas
D、shell
正确资料:


第6题,6.(2.5分)Thefloatingcoverorroofisadiskstructurethathassufficienttoensurethattheroofwillfloatunderallexpectedconditions.
A、weight
B、diameter
C、buoyancy
D、pressure
正确资料:


第7题,7.(2.5分)Corrosionisusuallythemostsevereatthe.
A、bottom
B、top
C、shell
D、interface
正确资料:


第8题,8.(2.5分)Itisnecessarytodrynaturalgaspipelines,.
A、after hydrostatic testing
B、when the line is put into service
C、following pipeline construction
D、before hydrostatic testing
正确资料:


第9题,9.(2.5分)Duringhydrostatictesting,fillthelinewithwaterandsubjectingittoapressuretocheckforleaks.
A、greater than the design operating pressure
B、the same as the design operating pressure
C、lower than the design operating pressure
D、the same as the allowable pressure
正确资料:


第10题,10.(2.5分)Meteringproblemismorecomplicatedingaslinessincecorrectionsaremoreimportant.
A、temperature
B、pressure
C、temperature and pressure
D、volume
正确资料:


第11题,11.(2.5分)Factorshelpdeterminetheamountofstoragearefineryneedsforbothfeedstockandproductsinclude:
A、product delivery
B、refinery complexity
C、seasonal demand
D、turnarounds
正确资料:


第12题,12.(2.5分)Attankerterminals,theamountofstoragedependson:
A、the amount and type of product handled
B、the number, capacity, and type of tanker berths
C、expected periods of downtime
D、the number and size of ships using the terminal?
正确资料:


第13题,13.(2.5分)Considerationsinvolvedindesigninglargecrudestoragetanksinclude:
A、integrity of the foundation
B、safety
C、maintenance requirements and ease of maintenance
D、operating efficiency
正确资料:


第14题,14.(2.5分)ForEFR,whichonesareright?
A、The design conditions of the external floating roof are more severe.
B、Pontoon roof is simply a steel deck with an annular compartment that provides buoyancy.
C、Double-deck roofs are strong and durable roofs.
D、Pontoon roofs are suitable for large diameter tanks.
正确资料:


第15题,15.(2.5分)ForIFR,whichonesareright?
A、IFR is covered by a fixed roof on top of the tank.
B、Pan roofs are simple sheet-steel disks with the edge turned up for buoyancy.
C、Bulkhead pan roof has open annular compartments at the periphery to prevent the roof from sinking.
D、Skin and pontoon roofs are usually constructed of an aluminum skin supported on a series of tubular aluminum pontoons.
正确资料:


第16题,16.(2.5分)Forfloatingroof,itcan.
A、reduce emissions from the storage of volatile organic compounds
B、reduce the potential for vapor space explosions
C、eliminate the possibility of boilover phenomenon
D、be constructed of steel
正确资料:


第17题,17.(2.5分)Fordouble-deckroof,whichonesareright?
A、It is the heaviest but most durable construction of all the roofs.
B、It is most economic for small diameters up to about 30ft and very large diameter from about 200 to over 300ft.
C、It maintains good rigidity under normal conditions.
D、It is much better insulated from solar heat gain?.
正确资料:


第18题,18.(2.5分)PVValvesareoftenreferredtoas.
A、pressure vacuum vent valves
B、pressure volume valves
C、breather valves
D、conservation valves?
正确资料:


第19题,19.(2.5分)Foractualinstallationofpipeline,whichonesareright?
A、Applying coating and wrapping to the exterior of the pipe should be done after welding.
B、Testing pipeline for leak is the last step.
C、Width of the pipeline ditch varies according to the size of the pipeline.
D、Backfilling of the ditch on top of the pipeline can be done with the soil excavated from the ditch.
正确资料:


第20题,20.(2.5分)Aboutcorrosion,whichareright?
A、Corrosion of iron and steel is a natural process.
B、Iron is not stable in its refined state.
C、Corrosion is selective and concentrated.
D、The basic corrosion mechanism of iron underground is electrochemical?.
正确资料:


第21题,21.(2.5分)Inselectingproductforcoatings,whichshouldbeconsidered?
A、Elasticity
B、Hardness
C、Adherence
D、Ease of application
正确资料:


第22题,22.(2.5分)Forgasmetering,whichonesareright?
A、The utilization range of a differential pressure meter is relatively narrow.
B、Positive-displacement meter has a direct reading of volumes.
C、For turbine-type meters, mechanical friction in the turbine must be minimal.
D、Mass-flow meters directly measure the mass of the fluid passing through the meter.
正确资料:


第23题,23.(2.5分)Forliquidmetering,whichonesareright?
A、A pipeline meter must be sturdy enough.
B、The parts in the positive-displacement meters have to be very precisely machined.
C、The products through positive-displacement meters must be filtered.
D、Compared with PD meters of equal output, turbine meters are much less bulky, sturdier and of simpler design.
正确资料:


第24题,24.(2.5分)Thecapacityofindividualstoragetanksorfacilitiesvarieswidely.
正确
错误
正确资料:


第25题,25.(2.5分)Ifproductsaredeliveredcontinuouslytoapipeline,storageneedswillbereduced.
正确
错误
正确资料:


第26题,26.(2.5分)Arefinerymusthavestorageforcrudetofeedtherefineryandtheproductsitmanufactures.
正确
错误
正确资料:


第27题,27.(2.5分)Naturalgascan'tbestoredindepletedoil-producingformations.
正确
错误
正确资料:


第28题,28.(2.5分)Low-pressuretanksmeantanksdesignedforalowerpressurethanatmospherictanks?.
正确
错误
正确资料:


第29题,29.(2.5分)Almostalltanksarecylindricalontheshellportion.
正确
错误
正确资料:


第30题,30.(2.5分)IFRisopenontopofthetank.
正确
错误
正确资料:


第31题,31.(2.5分)Flat-bottomtankisusedfortankslessthan60-200ftindiameter.
正确
错误
正确资料:


第32题,32.(2.5分)Theinternalfloatingroofsmaybeconstructedofsteeloraluminumorplastic?.
正确
错误
正确资料:


第33题,33.(2.5分)Extensivetestingofweldersandtheweldstheyproduceisnotimportantfortheconstructionofalllong-distancepetroleumpipelines.
正确
错误
正确资料:


第34题,34.(2.5分)Mostoffshorepipelinesarenotburiedbelowseabed.
正确
错误
正确资料:


第35题,35.(2.5分)Corrosionisdistributed?overtheentiremetalsurface.
正确
错误
正确资料:


第36题,36.(2.5分)Electrolyticcorrosionmayberapidandintensive?.
正确
错误
正确资料:


第37题,37.(2.5分)Insulationofpipelinefromsoilwithasuitablecoatingisenough.
正确
错误
正确资料:


第38题,38.(2.5分)Forrefinedhydrocarbonstoragetanks,bottompittingandgeneralcorrosionarelessseverethancrudeoiltanks.
正确
错误
正确资料:


第39题,39.(2.5分)Meteringliquid-carrylinesrequiresevenhigheraccuracythangaspipelines.
正确
错误
正确资料:


第40题,40.(2.5分)Themetersmustbecalibratedundertheactualworkingconditions.
正确
错误
正确资料:














本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有账号?会员注册

×
奥鹏作业答案,奥鹏在线作业答案
您需要登录后才可以回帖 登录 | 会员注册

本版积分规则

 
 
客服一
客服二
客服三
客服四
点这里给我发消息
点这里给我发消息
谋学网奥鹏同学群2
微信客服扫一扫

QQ|关于我们|联系方式|网站特点|加入VIP|加盟合作|投诉建议|法律申明|Archiver|小黑屋|奥鹏作业答案-谋学网 ( 湘ICP备2021015247号 )

GMT+8, 2024-12-23 22:24 , Processed in 0.098661 second(s), 20 queries .

Powered by Discuz! X3.5

Copyright © 2001-2023 Tencent Cloud.

快速回复 返回顶部 返回列表